The new building
sq.ft across the ground, first and second floors
~40,000
Ground floor opened to patients in July
2026
Centres of Excellence planned
5
Surgical and in-patient floors due to open
2027

Transforming rural healthcare

To mark 50 years of service to the rural community, TCT set out to expand the 50-bed Thirumalai Mission Hospital in Ranipet, to meet the growing need in the area for critical care and advanced surgery. Work began in January 2024. The ground floor was inaugurated on 12 April 2026 and has been open to patients since July 2026, and we are now equipping the first and second floors.

Ranipet became an independent district in 2019, but its healthcare infrastructure still centres on Vellore town — 40 minutes to an hour away from most of rural Ranipet. The need for accessible critical care and advanced surgery has never been more urgent. This new building, on land adjoining the current hospital in Vanapadi Village, is our answer.

Services are rolled out in phases, so that CSR funds are put to use year by year. The existing hospital keeps running normally throughout, and in-patients stay there until the new floors are ready. Once the new building is fully commissioned, the existing building will house administration, the canteen, pharmacy stores, the lab, imaging, and training and education.

Aerial view of the new TMH building, with the existing hospital on the right

Progress so far

From groundbreaking to the first patients

  1. January 2024

    Groundbreaking ceremony

    Groundbreaking ceremony
  2. March 2024

    Excavation, basement flooring and waterproofing

    Excavation, basement flooring and waterproofing
  3. January 2025

    Ground floor roof slab cast

  4. March 2025

    First floor roof cast

  5. June 2025

    Second floor roof and ramp cast

    Second floor roof and ramp cast
  6. July 2025

    Sewage and effluent treatment plant commissioned

    Sewage and effluent treatment plant commissioned
  7. August 2025

    Electrical works completed, with the required government licences

    Electrical works completed, with the required government licences
  8. January 2026

    Exterior painting, windows and interior works (partitions, tiling, fire safety systems)

    Exterior painting, windows and interior works (partitions, tiling, fire safety systems)
  9. 12 April 2026

    Building elevation completed and ground floor inaugurated

    Building elevation completed and ground floor inaugurated
  10. July 2026

    Ground floor opened to patients

    Ground floor opened to patients

Floor by floor

What is open, and what comes next

Second floor

Expected Q3 FY 2027–28

Private and semi-private rooms

9,634 sq.ft

First floor

Expected Q4 FY 2026–27

Operation theatres, recovery rooms, labour rooms and wards

14,467 sq.ft

Ground floor

Open since July 2026

Emergency & trauma, ICU, day care centre, out-patient department, pharmacy, lab collection, front desk and waiting areas

15,821 sq.ft

Basement

Commissioned

Parking

15,338 sq.ft

What it makes possible

Centres of Excellence

The additional infrastructure will help us establish Centres of Excellence in:

  • Diabetes & Heart Disease
  • Emergency & Trauma Care
  • Intensive Care (ICU)
  • Woman & Child Health
  • Surgical Specialities

What you can fund

Equipping the first and second floors

Many donors have already come forward to help, but a project of this size needs more partners. These are the infrastructure and medical equipment needs for the new building in 2026–27.

Amounts are in ₹ lakhs (1 lakh = ₹100,000). The list is indicative, not exhaustive.

Infrastructure & medical equipment · 2026–27

₹ lakhs

  1. Medical and paramedical workstations and interior works for wards on the first and second floors 100
  2. Modular operation theatres with equipment and accessories (2) 80
  3. Electrical works for the first and second floors 75
  4. Compound wall and patient access road 40
  5. Floor and wall tiling 20
  6. Interior partitions for patient rooms (10) 75
  7. Painting, interior and exterior 75
  8. Advanced Life Support ambulance with medical emergency accessories 50
  9. Syringe pump, infusion pump and multi-parameter monitor for each bed (25 beds) 40
  10. Plumbing works for the second floor 10
  11. Ultrasound machine 25
  12. C-arm for the operation theatre 25
  13. FRP handrails, supply and installation 20
  14. Medical gas pipeline and accessories for the first and second floors 15
  15. Pharmacy racks 15
  16. Bedside furniture and accessories for 25 beds 20